System Startup
5.2.1
MP940 Module
5-14
• Mount the MP940 on the side of the SGDH SERVOPACK for use. Be sure to mount the
MP940 on the SGDH SERVOPACK in the correct direction.
• Turn ON the power supply to the SGDH SERVOPACK within 10 seconds after turning
ON the power supply to the MP940. Failure to do so may result in the MP940 not being
synchronized with the SGDH SERVOPACK, and it will start to operate independently.
• If not using a cooling fan or similar device, mount the SGDH SERVOPACK and MP940
facing the correct orientation.
• Always ground the FG to 100 Ω max.
Correct Wrong
SGDH
M
P
9
4
0
SGDH
MP940
MP940
SGDH
Kommentare zu diesen Handbüchern